1. The boiler should now be hung on the wall to ensure that the water and gas connections match with those of the fixing jig.
2. The boiler should now be removed from the wall and the fixing jig can now be pre-plumbed without the boiler in position, with the exception of the condensate outlet and PRV pipes.