A specifically designed Plume Management Kit is now available from Glow-worm. It is possible to use them on any and every domestic boiler site where a high efficiency boiler is installed.
The Plume Management Kit fits onto the horizontal flue, used with Glow-worm high efficiency boilers.
This kit enables the flue products to be exhausted further away from the boiler flue duct, thereby reducing the visual impact of pluming and can be used to overcome many more site issues.
The flue outlet supplied terminates at 87° but can, if required, terminate vertically or at 45° by simply using the appropriate fittings. Siting can either be on a wall face with the terminal exhausting at right angles to the wall or above the eaves of a building.
We recommend that terminals exhausting vertically above the eaves are secured. The termination of the plume management kit should not be installed less than 2 metres above ground level.
The maximum standard horizontal flue allowed is 4 metres when used with a plume management kit. Additional elbows, bends and 1 metre extensions can be used as required. For each additional 87° or 2 x 45° bends fitted, the maximum length 6 metres must be reduced by 1 metre, the minimum length is 500mm.